Gerald R. Ford International Airport Terminal Reconstruction


Project Highlights:

  • 16” PCCP on CTB
  • 8” PCCP on open graded
  • 142,000 total syd of 16” PCCP
  • 11,000 total syd of 8” PCCP

What We Did


With prime contractor Kamminga & Roodvoets, Inc, Ajax Paving is laying 16” Portland Concrete Cement Pavement on CTB for FAA Specifications.

Project Photos:
Ajax Is Ready to Fly

Tight timeframes. Specialized design. Demanding safety requirements. Repaving and reconstructing airport runways is one of the most challenging types of construction. Ajax Paving is one of the few contractors in the U.S. with the expertise and experience to handle these technically-sophisticated jobs.

Over the last 25 years, Ajax has placed more than 4.5 million cubic yards of concrete runways. Our expert crews, a fleet of advanced equipment, and precise concrete mix technology enable us to meet unique complexities, specifications, and qualifications required by the Federal Aviation Administration (FAA).