Seeking Quotes for Upcoming Projects:

McNamara Terminal Apron Reconstruction ~ RFB 25-06936


Bid Date: September 9, 2026

25% SBE PARTICIPATION REQUIRED

Wayne County Ajax is seeking qualified SBE quotes for the McNamara Terminal Apron Reconstruction Package 7 project at Detroit Metropolitan Wayne County Airport (Project). The project includes the demolition and reconstruction of the concrete apron and Taxilanes U7 and U8 abeam gates A43 to A75. The project also includes utility reconstructions required for the final condition of the site. (The Contract resulting from this solicitation is subject to Airport Authority Prevailing Wages Requirements.)

Basic Bid Documents

Estimator(s): Chris Mondon


Submit DBE Responses to Ean Ridley 

Glenwood Rd ~ MDOT 260904 002


Bid Date: September 4, 2026

4% SBP PARTICIPATION REQUIRED

Wayne County 1.02 mi of hot mix asphalt cold milling and resurfacing, concrete pavement repair, curb ramps, guardrail, signing and pavement markings on Glenwood Road from Hannan Road easterly to Newburgh Road in the cities of Westland and Wayne, Wayne County. This is a Local Agency project. ** 1364 Cb **In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea.

If you are interested in learning more about MDOT's DBE or SBP Program, please contact Ean Ridley.

Ajax MDOT Letting Share

MDOT Bids Information

Estimator(s): Rob Liddell

Submit SBP Responses or Questions Regarding MDOT's SBP Program to Ean Ridley 

US-12 ~ MDOT 260904 013


Bid Date: September 4, 2026

5% SBP PARTICIPATION REQUIRED

Wayne County 1.62 mi of hot mix asphalt road reconstruction, geometric improvements, install dynamic inductive inroad charging system, storm sewer work, concrete curb and gutter, sidewalk, and ramp upgrades, traffic signal work, signing and pavement markings on US-12 from I-96 easterly to Cass Avenue in the city of Detroit, Wayne County. This project includes a 5 year materials and workmanship pavement warranty. ** Comb/Jt. 59942 Cb, Ea or Comb/Jt. 59942 Cb, K or Comb/Jt. 59942 Ea, J or Comb/Jt. 59942 Ea, K **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea, J, K and L.

If you are interested in learning more about MDOT's DBE or SBP Program, please contact Ean Ridley.

Ajax MDOT Letting Share

MDOT Bids Information

Estimator(s): Brandon King

Submit SBP Responses or Questions Regarding MDOT's SBP Program to Ean Ridley 

M-97 ~ MDOT 260904 015


Bid Date: September 4, 2026

2% DBE PARTICIPATION REQUIRED

Macomb County 3.45 mi of hot mix asphalt cold milling and resurfacing, concrete sidewalk ramp upgrades and pavement markings on M-97 from 8 Mile to I-696 in the city of Warren, Macomb County. This project includes a 3 year materials and workmanship pavement warranty. ** 7087 Cb **

If you are interested in learning more about MDOT's DBE or SBP Program, please contact Ean Ridley.

Ajax MDOT Letting Share

MDOT Bids Information

Estimator(s): Ben Kohler, PE

Submit SBP Responses or Questions Regarding MDOT's SBP Program to Ean Ridley 

Krafft Rd ~ MDOT 260904 025


Bid Date: 08/19/2026 - 09/04/2026

6% DBE PARTICIPATION REQUIRED

St Clair County 1.14 mi of construction of a roundabout including hot mix asphalt base crushing, shaping, and resurfacing, trenching, drainage improvements, concrete paving, curb and gutter, and pavement markings on Krafft Road from State Road to Parker Road, St. Clair County. This is a Local Agency project. ** 1358 Cb or 1358 Ea **In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K.

If you are interested in learning more about MDOT's DBE or SBP Program, please contact Ean Ridley.

Ajax MDOT Letting Share

MDOT Bids Information

Estimator(s): Sean Roarty

Submit SBP Responses or Questions Regarding MDOT's SBP Program to Ean Ridley 

M-29 ~ MDOT 260904 030


Bid Date: September 4, 2026

2% DBE PARTICIPATION REQUIRED

Macomb County 2.62 mi of hot mix asphalt cold milling and resurfacing, traffic loop replacement, concrete curb, gutter, ramp and sidewalk and pavement markings on M-29 from Donner Road easterly to Baker Road in the city of New Baltimore, Macomb County. This project includes a 3 year materials and workmanship pavement warranty. ** 4049 Cb **

If you are interested in learning more about MDOT's DBE or SBP Program, please contact Ean Ridley.

Ajax MDOT Letting Share

MDOT Bids Information

Estimator(s): Ben Kohler, PE

Submit SBP Responses or Questions Regarding MDOT's SBP Program to Ean Ridley