[1] =>
SR 56 from Meadow Pointe Blvd to US 301 in Wesley Chapel, FL. The project includes the section of SR 56 starting at the intersection with Meadow Point Blvd ending at the cross with US 301. 67,000 tons of mix were placed approximately. 3 inches of Structural course were placed, topped with 0.75 inches of FC-5 friction course. This job had a 1.02 pay factor on the asphalt mix due to its great results. It had a 4.1 Ride number.
If you’ve flown ‘in or out’ of Michigan or Florida, there’s a solid chance you’ve experienced our work firsthand. The same goes for many of the roads and highways in the midwest. Even if you don’t think you’ve driven on our work, there’s a good possibility the safety, drivability, and performance of your vehicle was tested on one of the many test tracks we developed for Ford, GM, and other manufacturers. Even NASCAR® trusts our quality results for their high-spec precision tracks. When we say ‘The Future is Riding on Ajax’... we mean it. Since 1981, we’ve had our hands in some of the most demanding and challenging paving jobs in Florida. We’re proud of the work we do and continue to operate guided by the same principles set in place by our founder Herb Jacob: Quality, Safety, and Productivity.
::BLOCK:: ::PROJECTS::35::Florida - Airport Runways & Taxiways ::BLOCK::
::BLOCK:: ::PROJECTS::34::Florida - Concrete Construction ::BLOCK::
::BLOCK:: ::PROJECTS::36::Florida - Design-Build Projects ::BLOCK::