[1] =>
The I-275 Design-Rebuild was a $215 million investment in Tampa's future. As a joint partner, Ajax Paving played a major role in widening and reconstructing 3.4 miles of this major artery through the heart of the city. The project used 100,000 tons of HMA and warm mix. Additionally, 145,000 square yards of plain cement was used, batched on-site with a single-drum Erie Strayer Mixer. Other project requirements included upgrading 21 bridges, laying 1.6 million cubic yards of excavation and embankment, installing 37,000 linear feet of storm drainpipe, and constructing four new storm-water ponds.
The I-275 Design-Build Reconstruction was completed 16 days ahead of schedule. The project also won numerous industry awards, including the 2016 Florida Department of Transportation (FDOT) Best in Construction Urban Roadway, Road & Bridge Magazine’s Top 10 Project in the USA in 2016 and the DBIA Florida Region Transportation 2016 Project of the Year Award.
If you’ve flown ‘in or out’ of Michigan or Florida, there’s a solid chance you’ve experienced our work firsthand. The same goes for many of the roads and highways in the midwest. Even if you don’t think you’ve driven on our work, there’s a good possibility the safety, drivability, and performance of your vehicle was tested on one of the many test tracks we developed for Ford, GM, and other manufacturers. Even NASCAR® trusts our quality results for their high-spec precision tracks. When we say ‘The Future is Riding on Ajax’... we mean it. Since 1981, we’ve had our hands in some of the most demanding and challenging paving jobs in Florida. We’re proud of the work we do and continue to operate guided by the same principles set in place by our founder Herb Jacob: Quality, Safety, and Productivity.
::BLOCK:: ::PROJECTS::35::Florida - Airport Runways & Taxiways ::BLOCK::
::BLOCK:: ::PROJECTS::34::Florida - Concrete Construction ::BLOCK::
::BLOCK:: ::PROJECTS::36::Florida - Design-Build Projects ::BLOCK::