Project Highlights:

  • $4.6 million project for Hillsborough County Aviation Authority
  • 90,000 SY of Full Depth Reclamation
  • 15,000 tons of asphalt

What We Did


This project consisted of the in-place reconstruction of Runway and 4-22 and parallel Taxiway A at Peter O Knight Airport on Davis Island in Tampa. Other work consisted of the placement of airfield drainage and the reconstruction of multiple small taxiways and hangar areas. Approximately 90,000 SY of full-depth reclamation were constructed with 15,000 tons of P-401 asphalt. The project was phased to minimize impacts to the Airfield. Airfield electrical signage and airfield markings we also key elements of the Project.

Ajax Is Ready to Pave Airports.

Tight timeframes. Specialized design. Demanding safety requirements. Repaving and reconstructing airport runways is one of the most challenging types of construction. Ajax Paving is one of the few contractors in the U.S. with the expertise and experience to handle these technically-sophisticated jobs.

Over the last 36 years, Ajax has placed more asphalt and concrete on airports than any other paving company on Florida's Gulf Coast. Our expert crews, a fleet of advanced equipment, and precise asphalt and concrete mix technology enable us to meet unique complexities, specifications, and qualifications required by the Federal Aviation Administration (FAA).

On Florida's Gulf Coast, Ajax Paving has successfully completed projects at the following airports: MacDill Air Force Base, Tampa International, St. Pete Clearwater Airport, Bartow, Albert Whitted Airport, Peter O. Knight, Lakeland Linder, Sarasota Bradenton, Venice Municipal, Punta Gorda Airport, Labelle, Page Field, Southwest Florida International, Naples Airport and other local airfields.

Contact Ajax Today